Ports & Terminals

Gothenburg to electrify 1,250 m of terminal rail from 2027

Gothenburg will install 1,250 m of overhead lines at its AM Terminals rail terminal from 2027, cutting train turnaround by up to 30 minutes and extending trains to 750 m.

Gothenburg port moves to electrify container terminal rail operations - Splash247
Exhibit · Gothenburg port moves to electrify container terminal rail operations - Splash247 — Licht-aus / pixabay

Adjustments

  1. Approximately 1,250 m of track to be electrified at the APM Terminals-operated terminal, with construction starting in 2027
  2. Train turnaround times expected to fall by up to 30 minutes
  3. Maximum train length to rise from 630 m to 750 m
  4. Terminal handles about 80 trains per week to more than 20 Swedish destinations; rail volume hit a record 529,000 teu in 2025
  5. ProTrain's HVO100 shunting locomotives are expected to cut port rail emissions by up to 90%

The Port of Gothenburg will electrify approximately 1,250 m of railway track at its container terminal, allowing electric locomotives to run directly to and from the APM Terminals-operated facility without diesel-powered shunting. Construction is scheduled to begin in 2027.

The scheme covers the installation of 38 line masts carrying the overhead lines, upgraded level crossing protection systems and a new emergency access road. The physical scope is modest by port-investment standards, but the operational change is not: electric trains will no longer need to pass through the port's departure yard.

What does the investment change for operators?

The port expects the electrification to cut container train turnaround times by up to 30 minutes per call. It will also lift the ceiling on train length from the current 630 m, a limit imposed by the departure yard infrastructure, to 750 m (a 19% increase in slots per trainset).

APM Terminals Gothenburg currently handles around 80 trains per week, linking the port with more than 20 destinations across Sweden. Rail volumes hit a record 529,000 teu in 2025 and have kept climbing this year, placing growing demands on the existing rail infrastructure.

Birna Ödefors, managing director of APM Terminals Gothenburg, welcomed the investment. She said it would eliminate another fossil fuel dependency from the terminal's transport operations.

How does it fit the port's emissions push?

The electrification follows earlier work to cut emissions from port railway operations. Rail operator ProTrain has already introduced shunting locomotives running on HVO100 (a fully renewable hydrotreated vegetable oil fuel).

Those locomotives are expected to reduce emissions from ProTrain's port operations by up to 90%. Track electrification removes the remaining diesel dependency from the line-haul leg of the terminal's rail flows.

For shippers routing Swedish box traffic through Gothenburg, the practical gains land in 2027: shorter terminal dwell for trains, 750 m trainsets in place of 630 m, and rail capacity headroom for a volume base of 529,000 teu that is still growing.

via Google News: Ports & Terminals (Source)

Share this article:

More from Rebecca Stone

Rebecca Stone

Show full bio

News editor covering people, launches and day-to-day practice in commercial shipping for industry professionals at Vessels.

134 articles

Linked entries

  1. Gothenburg wires APM Terminals rail tracks for electric shuttles
  2. Gothenburg Awards Fairway Dredging Contract for Mega-Boxship Access
  3. Boskalis-Van Oord-Rohde Nielsen JV wins Gothenburg fairway deepening
  4. Rijeka picks Končar for 17.5 MW shore power at two terminals
  5. Helsingborg opens consultation on southern container terminal plan

▲ Previous article