Canada's Coast Guard Takes Delivery of First AOPS, CCGS Donjek
Irving Shipbuilding has delivered CCGS Donjek, the first of two coast guard Arctic and Offshore Patrol Ships, at Halifax Shipyard. The sister ship, CCGS Sermilik, follows in 2027.
Adjustments
- CCGS Donjek delivered at Halifax Shipyard, first of two coast guard AOPS from Irving Shipbuilding.
- The ship measures 104.7 meters, displaces 6,677 metric tons, and has 57 berths for a crew of 31.
- Second coast guard AOPS, the future CCGS Sermilik, is scheduled for delivery in 2027.
- The AOPS will replace two existing coast guard offshore patrol vessels.
Canada's coast guard has accepted CCGS Donjek, the first of two Arctic and Offshore Patrol Ships (AOPS) built by Irving Shipbuilding, at a ceremony held at Halifax Shipyard in Nova Scotia on Friday.
The 104.7-meter vessel, named after the Donjek Glacier in Kluane National Park in Yukon, displaces approximately 6,677 metric tons and measures 19 meters (62 feet) across the beam, according to Irving.
What will the ship do?
Irving said Donjek will carry out fisheries enforcement and surveillance on Canada's east coast, support offshore search and rescue, and conduct icebreaking in Arctic and southern waters.
Its icebreaking capability covers the low Arctic in summer and the east coast in winter. The shipbuilder also listed science research, humanitarian assistance and aids-to-navigation work among the vessel's tasks.
For that navigation work, the ship carries a 20-metric-ton crane.
How is the ship fitted out?
The vessel accommodates a crew of 31, with 57 berths in total, Irving said.
It has a helicopter deck and hangar capable of housing coast guard helicopters as well as the Canadian military's Cyclone helicopter.
What does the delivery mean for the fleet?
The government said the AOPS will replace two of the coast guard's existing offshore patrol vessels.
The coast guard ships build on experience from the delivery of the Royal Canadian Navy's six Harry DeWolf-class Arctic and Offshore Patrol Ships, according to the government.
The second coast guard AOPS, the future CCGS Sermilik, is scheduled for delivery in 2027, Irving said.
"From design to first steel to delivery, CCGS Donjek is a testament to the skill and professionalism of a Canadian workforce dedicated to building the best ships for Canada," said Irving Shipbuilding President Dirk Lesko.
Donjek's tonnage sits in roughly the same class as the navy's Harry DeWolf-class ships on which its design is based, giving the coast guard a common hull type across two operators.
via Google News: Shipbuilding (Source)
More from Rebecca Stone
Show full bio
News editor covering people, launches and day-to-day practice in commercial shipping for industry professionals at Vessels.
188 articles
Linked entries
- Irving hands first Coast Guard AOPS to Canada, Donjek enters service
- Irving Delivers CCGS Donjek, First Coast Guard AOPS, in Halifax
- Canada's NSS Hits Its Stride: $24B Sub Deal, $11B Icebreakers, $80B Destroyers
- Bjørn Shipping orders 34m aquaculture vessel for 2028
- Seaspan places $182m steel order for up to six Canadian icebreakers