Canada's NSS Hits Its Stride: $24B Sub Deal, $11B Icebreakers, $80B Destroyers
TKMS lands Canada's 12-boat, $24B submarine deal with $100B life-cycle cost, Davie gets $11B for six icebreakers and Irving lays the keel of the first $80B River-class destroyer.

Adjustments
- TKMS selected July 6 to supply up to 12 Type 212CD submarines; $24B acquisition, ~$100B life-cycle, first delivery 2033-2034
- Babcock Canada won a six-year, $1.1B extension of the Victoria-class VISSC sustainment contract on July 20
- $11B order for six Polar Class 3 icebreakers at Davie, first steel 2027, full fleet in service by 2038
- Keel laid June 12, 2026 for HMCS Fraser, first of 15 River-class destroyers in an $80B+ program
- First Seaspan Joint Support Ship delayed from 2026 to 2027; RCN rejected buying or re-leasing Asterix
Canada's National Shipbuilding Strategy has moved from PowerPoint to plate steel, with a $24 billion submarine deal, an $11 billion icebreaker order and an $80 billion destroyer program all running at once. Since June 2010 the NSS has promised ships. Only in the last several years has it delivered them, and the orderbook keeps growing.
Who won the submarines?
Prime Minister Mark Carney announced on July 6 that thyssenKrupp Marine Systems (TKMS) will supply the Royal Canadian Navy with up to 12 Type 212CD boats — the largest defence procurement in Canadian history. The design is already in build for Germany and Norway. The boats replace the Victoria-class fleet, with first delivery expected in 2033-2034. Reports suggest the initial contract covers eight submarines, with a follow-on for four more.
The acquisition alone is estimated at $24 billion. Add long-term maintenance — some estimates run to $60 billion over the decades — and the life-cycle cost hits roughly $100 billion.
Carney said the purchase will strengthen Canada's defence industrial base and "will deepen our partnerships with trusted allies, and they will open new opportunities for Canadian businesses in European supply chains." TKMS CEO Oliver Burkhard said the company is ready to provide Canada with significant economic benefits.
Who gets the sustainment work?
At least two majors are circling. Arcfield Canada, calling itself a leading provider of sovereign sustainment and mission-support services, says it looks forward to "continued discussions with TKMS to deliver a proven, low-risk, and integrated sustainment solution." Babcock Canada wants the same work.
Babcock has credentials. On July 20 it received a six-year, $1.1 billion extension to the Victoria In-Service Support Contract (VISSC), keeping the Victoria-class boats running into the mid-to-late 2030s. The extension can run to the fleet's end of life. Babcock has been the government's submarine sustainment partner for more than 18 years, completing three extended docking work periods and integrating the Mk 48 MOD 7AT torpedo, a new Submarine External Communications System and a Universal Modular Mast. It claims VISSC has generated over $3.2 billion in GDP impact since 2008, sustained more than 1,500 jobs annually and built a supply chain of over 450 Canadian suppliers. It has also awarded Seaspan Victoria Shipyards a six-year sub-contract extension on VISSC, and signed an MoU with Larus as its preferred AI supplier for predictive submarine maintenance.
How are the River-class destroyers coming?
Irving Shipbuilding held the keel-laying ceremony for HMCS Fraser, the first Canadian Surface Combatant, on June 12, 2026. The program costs more than $80 billion and replaces the Halifax-class frigates. First delivery is expected in the early 2030s, nine vessels by 2040, and all 15 by 2050.
Babcock won Irving's River-class lifts contract — worth $37.5 million — to design, build and commission food hoists and stores lifts across the first three hulls, delivering through 2029. The design is based on Babcock's solution for the UK Type 26 frigate, also the baseline for Australia's Hunter class.
What about icebreakers?
On Aug. 24, Carney committed $11 billion for six program icebreakers at Chantier Davie in Lévis, Québec — nearly 5,000 construction-phase jobs, Canadian steel under the Buy Canadian Policy. The Polar Class 3 vessels replace the Coast Guard's aging heavy and medium breakers, keeping Canada home to NATO's largest icebreaking fleet. First steel is cut in 2027, the first ship arrives five years later, and the full fleet enters service by 2038. Davie's earlier wins include a $19.6 million initial design contract from March 2024 and a $3.25 billion contract in 2025 for the Polar Max heavy icebreaker.
What else is on the board?
- Joint Support Ships: the RCN's first JSS slipped from 2026 to 2027 on "continued challenges associated with outfitting a first-in-class, complex warship"; the second remains on track for 2027/2028.
- Asterix: the RCN rejected Federal Fleet's pitch to renew the lease or sell Combat Support Ship Asterix outright when the charter ends in January 2028, betting the JSS will arrive in time.
- Continental Defence Corvette: the navy wants 16 to 20 homeland-defence corvettes, contract award around 2030, first ship operational in 2039. The April 9, 2026 briefing envisages anti-submarine and surface-warfare capability, 7,000 nautical miles of range and 30-day patrols. Ontario Shipyards in St. Catharines is lobbying hard. CEO Shaun Padulo told CBC News: "We at Ontario Shipyards, and our supply chain, can give the Royal Canadian Navy and Coast Guard the ships they need while building Canadian capacity, strengthening our sovereignty, and creating durable, economic opportunity here at home."
- Small vessels: the CCGS Baie de Gaspé, the 20th Bay-class SAR lifeboat built under the NSS, joined the Coast Guard in October. Chantier Naval Forillon and Hike Metal Products built the fleet under contracts worth roughly $180 million. Thirty small vessels have now been delivered under the NSS.
via Google News: Shipbuilding (Source)
More from Tom Whitfield
Show full bio
Staff writer covering companies, deals and strategy in commercial shipping for industry professionals at Vessels.
57 articles
Linked entries
- COSL orders 59 offshore support vessels in $1.64bn deal
- COSCO Books 16 VLCCs for $2.01bn as Yards in Three Countries Bag Tanker Orders
- Offen firms four 7,000 teu boxship order in China
- Belfast shipyard positioned for billions in UK defence contracts
- Yangzijiang books US$6.98Bn in orders, tops 2026 target by 55%