Maritime Tech

ABB wins order to power third WSF hybrid-electric ferry newbuild

WSF exercises its option for a third hybrid-electric ferry, tasking ABB with a 13.2MWh battery system and full power package as it targets up to 16 hybrid newbuilds by 2040.

ABB to power third Washington State Ferries hybrid-electric newbuild vessel - Ships Monthly
Exhibit · ABB to power third Washington State Ferries hybrid-electric newbuild vessel - Ships Monthly — GoranH / pixabay

Adjustments

  1. WSF issued ABB a Notice to Proceed for a third hybrid-electric ferry, expanding the scope from two to three vessels
  2. The third ferry gets a 13.2MWh battery system enabling zero-emission operation on short routes and in port
  3. WSF plans up to 16 hybrid-electric ferries by 2040 and a fully emission-free fleet by 2050
  4. WSF burns about 19 million gallons of diesel annually and targets 94% NOx and 76% CO2 cuts by 2040
  5. ABB's original involvement was announced in 2024 under a two-vessel contract with an option for a third

ABB has received the Notice to Proceed from Washington State Ferries (WSF) to supply and integrate the power and propulsion system for a third hybrid-electric newbuild, expanding the Swiss-Swedish group's scope from two vessels to three.

The order forms part of WSF's plan to introduce up to 16 new hybrid-electric ferries by 2040. The programme aims to cut emissions, improve operational efficiency and modernize one of the world's largest ferry networks — and WSF is the largest ferry operator in the United States.

What does the third vessel get?

Like the first two hulls, the third ferry will run ABB's integrated hybrid-electric power and propulsion package built around the Onboard DC Grid and the PEMS Power and Energy Management System (a system that continuously matches available power sources to operating conditions). ABB says the setup optimizes power distribution and energy storage, reducing reliance on diesel engines and cutting fuel consumption and emissions.

The vessel will also carry a 13.2MWh energy storage system integrated by ABB. The battery installation supports all-electric, zero-emission operation on shorter routes and while alongside in port.

ABB's scope of supply across the first three vessels is broad. It covers:

  • Integrated marine automation
  • Propulsion drives and motors
  • Transformers and low-voltage systems
  • Uninterruptible power supply systems
  • Remote diagnostics
  • Propulsion shafting, propellers, steering gear and rudders
  • Engineering and commissioning support

How big are the emission cuts?

WSF currently burns approximately 19 million gallons of diesel fuel annually. Through electrification, the operator targets reductions by 2040 of:

  • 76 per cent in carbon dioxide emissions
  • 75 per cent in sulphur oxides
  • 94 per cent in nitrogen oxides
  • 90 per cent in particulate matter

The longer-term objective is a fully emission-free fleet by 2050.

The latest authorization builds on ABB's original involvement in the project, first announced in 2024. That followed confirmation of the initial shipbuilding contract covering two vessels plus an option for a third ship — an option WSF has now exercised.

via Google News: Shipbuilding (Source)

Share this article:

More from Sophie Lindqvist

Sophie Lindqvist

Show full bio

Market editor covering technology and product news in commercial shipping for industry professionals at Vessels.

102 articles

Linked entries

  1. CMAL Takes Delivery of Delayed Islay Ferry MV Loch Indaal in Turkey
  2. Rijeka picks Končar for 17.5 MW shore power at two terminals
  3. Jiangnan begins 175,000 m³ LNG carrier series for Shell
  4. Port of Blyth unveils 3-hectare plan and 1m channel deepening
  5. Boluda agrees Samskip deal, targeting 32-vessel short-sea network

▲ Previous article