Fleet & Shipbuilding

Skaramangas Completes Greece's First LNG Carrier Repair

Skaramangas Shipyards has repaired the 173,400 m³ LNG carrier Maran Gas Amphipolis, a Greek-industry first, and earned GTT Approved Repair Yard status after its 2023 relaunch.

Skaramangas Shipyards Completes First LNG Carrier Repair in Greek Ship Repair Industry - www.imarinenews.com
Exhibit · Skaramangas Shipyards Completes First LNG Carrier Repair in Greek Ship Repair Industry - www.imarinenews.com — Gaz_Chapp / pixabay

Adjustments

  1. Skaramangas completed Greece's first LNG carrier repair, on the 173,400 m³ Maran Gas Amphipolis (built 2016).
  2. The yard gained GTT certification as an approved repair yard.
  3. It repaired the VLCC Acheloos (built 2026) in September 2026, its first VLCC job in nearly two decades.
  4. The yard reopened in 2023 after Procopiou investment; it spans 760,000+ sqm with two large dry docks.
  5. An MoU with HD Hyundai Heavy Industries (June 2025) targets Hellenic Navy and Coast Guard surface vessels.

A 173,400 m³ liquefied natural gas carrier has become the first LNG vessel ever repaired at a Greek shipyard. Skaramangas Shipyards completed dry-dock maintenance, repairs and specialized inspections on the 2016-built "Maran Gas Amphipolis", calling the job "a milestone for the Greek ship repair industry."

The yard, backed by Greek shipping magnate George Procopiou, sealed the delivery with something more durable than a press release. It earned certification from GTT, the French containment-technology specialist whose membrane cargo systems dominate the LNG fleet, and now carries the status of a "GTT Approved Repair Yard."

For a facility that sat idle for years, that's two firsts stacked on top of each other.

What has the yard delivered so far?

The Amphipolis job caps a run of heavyweight returns to the repair game. In September 2026, Skaramangas completed work on the VLCC (Very Large Crude Carrier) "Acheloos", built in 2026 and owned by Dynacom Tankers, another Procopiou company. That project marked the yard's first VLCC repair in nearly two decades, according to the shipyard.

The pattern is deliberate: Procopiou-controlled tonnage is anchoring the orderbook while the yard rebuilds its credibility with outside owners and class societies.

How did the yard get back on its feet?

Skaramangas had been idle for several years before Procopiou's investment brought it back to life in 2023. The site is not small. It covers more than 760,000 square meters and operates two large dry docks, giving it capacity for the biggest tankers and gas carriers in the fleet.

The revival has since widened beyond commercial repairs. In June 2025 the yard signed a memorandum of understanding (MoU) with South Korean shipbuilder HD Hyundai Heavy Industries. The target: jointly building surface vessels for the Hellenic Navy and the Hellenic Coast Guard, with the broader European market in view.

What does Procopiou want the yard to become?

The chairman has sketched an ambitious brief. Procopiou said: "In the future, the shipyard will undertake vessel repair work, handle new construction, upgrades, and refurbishments for superyachts, provide services for LNG carriers, and, of course, participate in any new shipbuilding projects for the Hellenic Navy."

That's four business lines from a standing start: repairs, new construction, superyacht refits, and LNG services, plus defense work on top. The GTT approval now formalizes the LNG leg of that plan.

For Greek shipowners, the practical payoff is closer to home. LNG tonnage that previously had to steam to Mediterranean or Northern European repair hubs for membrane-cargo work can now dry-dock at Skaramangas with a certified yard behind the job.

via Google News: Shipbuilding (Source)

Share this article:

More from Tom Whitfield

Tom Whitfield

Show full bio

Staff writer covering companies, deals and strategy in commercial shipping for industry professionals at Vessels.

93 articles

Linked entries

  1. Yangzijiang Delivers China's First Privately Built 175,000-cbm LNG Carrier
  2. Korean LNG insulation duopoly eyes US export project windfall
  3. Jiangnan begins 175,000 m³ LNG carrier series for Shell
  4. Brazilian Yards Land 25 New Vessel Orders on Petrobras and Transpetro Demand
  5. Durban Gateway races 20-day backlog with crane repairs and 70-unit fleet order

▲ Previous article▼ Next article