Fleet & Shipbuilding

SGM to Convert 130-Metre Barge into Floating Dry Dock in Taranto

SGM plans a semi-submersible floating dry dock with 15,000-17,000-tonne capacity in Mar Piccolo, Taranto. The 130- by 40-metre barge Miss Nora must thread a 58-metre channel. SGM claims it can do the conversion in-house.

Italian shipbuilder acquires barge for conversion into floating dry dock - Baird Maritime
Exhibit · Italian shipbuilder acquires barge for conversion into floating dry dock - Baird Maritime — JuliaBoldt / pixabay

Adjustments

  1. SGM bought the barge Miss Nora (130 x 40 m) to convert into a semi-submersible floating dry dock at Taranto's Mar Piccolo.
  2. Projected dry-docking capacity: 15,000-17,000 tonnes; cargo transport capacity about 22,000 tonnes.
  3. Transit under Taranto's Ponte Girevole swing bridge expected around November 26; RTM Web reported a November 28 transit at 04:30.
  4. Access channel to Mar Piccolo is 58 metres wide at the narrowest point with 12 metres depth on the centreline.
  5. SGM acquired the former Cantieri Tosi yard in 2021 and has used it for steel fabrication, assembly and Benetti yacht refits.

Italian shipbuilder SGM has bought the barge Miss Nora and plans to convert it into a semi-submersible floating dry dock at the former Cantieri Tosi yard in Taranto. The company projects 15,000 to 17,000 tonnes of dry-docking capacity once the work is done. Note the tense: this is a projection, not a delivered dock.

SGM says it will handle the conversion in-house. That cuts a yard fee but puts the engineering risk on the builder's own plate. No timeline for completion appears anywhere in the announcement.

The numbers are real enough. Miss Nora measures 130 by 40 metres. SGM also cites a cargo transport capacity of roughly 22,000 tonnes — a separate figure, and one the company doesn't break down.

When does the barge actually arrive?

The 130-metre hull must pass under Taranto's Ponte Girevole swing bridge into Mar Piccolo. SMM expects the transit around November 26, weather and sea conditions permitting — the standard caveat that swallows many a schedule. RTM Web reported the transit planned for November 28 at 04:30 local time.

Either date, the transit is tight. The channel linking Mar Grande and Mar Piccolo runs 58 metres at its narrowest point, with 12 metres of depth along the centreline. A 40-metre beam leaves 18 metres of margin across the pinch point if the tow is dead straight.

What does the dock change for owners?

SGM is aiming at merchant and industrial vessels, large yachts, tourist and cruise service craft, plus state operators: navy, coast guard, financial police and fire service. The pitch is cost. SGM says the dock could cut repositioning costs for owners who currently send vessels to other cities for drydocking. Fair claim, but it rests on the conversion finishing on time and on budget — two things the release does not address.

Taranto already has dry-docking infrastructure. The naval arsenal includes the Ferrati dock, which reopened in November 2026 and has handled the Italian Navy support ship Vulcano. SGM will not be the only lift in town. Whether the city can fill two docks plus a new floating unit is a question the announcement skips entirely.

The site itself carries some weight. SGM lists two berthing quays and a basin more than 100 metres long. The company acquired the Taranto yard in 2021 and has since run steel and piping fabrication, vessel assembly, and yacht maintenance and refit there — including hull work on yachts with Benetti.

Why watch this one closely?

The plan checks the usual boxes: an in-house conversion, a stated capacity band, a dated transit window. What's missing matters just as much — no cost figure, no completion date, no class or certification route named for the finished dock.

The market signal is still worth registering. A 15,000-17,000-tonne lift added to southern Italy's repair capacity, in a port already hosting naval work, gives owners an option they didn't have before, provided the barge makes it under the bridge and the conversion goes as promised.

via Google News: Shipbuilding (Source)

Share this article:

More from James Calloway

James Calloway

Show full bio

Correspondent covering technology and product news in commercial shipping for industry professionals at Vessels.

223 articles

Linked entries

  1. Saronic signs $100m+ Syncrolift shiplift deal for Port Alpha yard
  2. Clean-product tanker rates slide as Hormuz transits fall to 14 ships
  3. Patti Marine puts 800-ton Amanda Joe dock into service
  4. Tsuneishi Launches Unnamed Kamsarmax at Fukuyama Yard
  5. Suez Canal Authority Targets Two Vessels a Month With 50-Tugboat Export Push

▲ Previous article▼ Next article