Ports & Terminals

Port of LA Drafts 40-Year Extension for Phillips 66 Wilmington Oil Terminal

The Port of Los Angeles has released a Draft EIR for Phillips 66's Marine Oil Terminal and Wharf Improvements Project at Berths 148-151 in Wilmington, covering up to 40 years of continued oil terminal operations.

Port Releases Draft Review for Wilmington Oil Terminal - Wisevoter
Exhibit · Port Releases Draft Review for Wilmington Oil Terminal - Wisevoter — erwinbosman / pixabay

Adjustments

  1. The Port of Los Angeles released the Draft Environmental Impact Report on November 21, 2026.
  2. The proposal covers up to 40 years of operation: a 20-year entitlement term with two optional 10-year extensions.
  3. Phillips 66 proposes a new berthing facility at Berths 150-151 complying with MOTEMS.
  4. The existing wharf at Berths 148-149 would keep operating during construction, then shift to equipment storage and harbour-craft mooring.
  5. The environmental review began with an Initial Study and Notice of Preparation in February 2023.

The Port of Los Angeles has released a Draft Environmental Impact Report for the Marine Oil Terminal and Wharf Improvements Project at Berths 148-151 in Wilmington — a proposal that would keep Phillips 66's marine oil terminal in service for up to 40 years. That is longer than the typical commercial lease cycle at a container terminal (usually 15 to 30 years), and the entitlement terms stay unresolved until the Final Environmental Impact Report is issued.

What does the draft EIR cover?

The document evaluates up to 40 years of continued marine oil terminal operation, structured as a proposed 20-year entitlement term with two optional 10-year extensions. The Port of Los Angeles, as the municipal seaport agency responsible for environmental review of projects on its waterfront, released the draft to gather feedback before preparing the final version.

The review timeline so far:

  • February 2023 — Initial Study and Notice of Preparation released, starting the environmental review
  • November 21, 2026 — Draft Environmental Impact Report released by the Port of Los Angeles

What does Phillips 66 propose to build?

Phillips 66, the American energy company with refining, midstream and marketing operations, operates the existing marine oil terminal at Berths 148-151. The project centres on a new berthing facility at Berths 150-151 designed to comply with the Marine Oil Terminal Engineering and Maintenance Standards (MOTEMS, the California regulations governing how marine oil terminals are built and maintained).

Under the proposal, the existing wharf at Berths 148-149 would continue operating as a marine oil terminal during construction, then be downgraded to non-terminal functions — storing equipment and mooring harbour craft. Landside scope includes modification and upgrade of piping, vapour recovery systems, support systems and tankage.

By extending operations for up to 40 years, the proposal keeps the Wilmington terminal in service within the MOTEMS framework rather than departing from it.

Who can weigh in?

Residents and businesses in Wilmington and the surrounding Los Angeles area can review the draft and submit comments to the Port of Los Angeles before the Final Environmental Impact Report is issued. Comments submitted at the draft stage can influence the final approval terms — how long, and under what conditions, the facility operates.

Operations at the Phillips 66 terminal will continue during construction at Berths 148-149, so day-to-day activity at the site is expected to persist throughout the build.

The draft window is now open; the final terms of a 40-year entitlement sit behind it.

via Google News: Ports & Terminals (Source)

Share this article:

More from Rebecca Stone

Rebecca Stone

Show full bio

News editor covering people, launches and day-to-day practice in commercial shipping for industry professionals at Vessels.

128 articles

Linked entries

  1. Los Angeles Port Puts Phillips 66 Terminal Rebuild Out for Review
  2. Phillips 66 Los Angeles berth plan enters draft environmental review
  3. Long Beach clears 937,000 TEUs in October, up 5% on record pace
  4. Tenerife Port Authority Joins SEA-LNG as First Mid-Atlantic Member
  5. Port of Blyth unveils 3-hectare plan and 1m channel deepening

▲ Previous article▼ Next article