Los Angeles Port Puts Phillips 66 Terminal Rebuild Out for Review
Port of LA has released a draft EIR for rebuilding the Phillips 66 marine oil terminal at Wilmington, with a new MOTEMS-compliant berth at 150-151 and up to 40 more years of operation.

Adjustments
- Draft EIR released for Phillips 66 marine oil terminal redevelopment at Wilmington, California.
- New tanker berthing facility proposed at Berths 150-151 to meet MOTEMS standards.
- Proposal includes a 20-year operating entitlement plus two optional 10-year extensions — up to 40 years.
- Existing wharf at Berths 148-149 keeps handling tankers during construction, then shifts to non-oil uses.
- Public comments on the draft report are open until 4 January 2027; review began in 2023.
The Port of Los Angeles has opened public review of a draft environmental impact report (EIR) for a proposed redevelopment of the Phillips 66 marine oil terminal in Wilmington, with comments accepted until 4 January 2027.
The filing sets out a rebuild centred on a new tanker berthing facility at Berths 150-151, designed to bring the terminal into compliance with California's Marine Oil Terminal Engineering and Maintenance Standards (MOTEMS), the state rulebook governing the engineering assessment and upkeep of marine oil terminals.
What does the proposal actually change?
The core of the project is a shift in where tankers call. A new facility would be constructed at Berths 150-151, replacing the terminal's current shiphandling footprint at the existing wharf at Berths 148-149.
That existing wharf wouldn't sit idle during the works. It would continue handling oil tankers throughout the construction period, keeping cargo moving while the new berths take shape alongside.
Once the new facility enters service, the older berths would be repurposed. Their future role would be restricted to non-oil terminal uses, with the draft report naming two: equipment storage and occasional mooring for harbour craft.
The rebuild goes beyond the berth structure itself. The proposal also covers upgrades to:
- pipelines serving the terminal;
- vapour recovery equipment, the systems that capture cargo vapours emitted during tanker loading;
- support systems; and
- storage tanks feeding the new loading platform.
How long could the terminal keep operating?
The entitlement question is the other headline number in the filing. The proposed development includes a new 20-year operating entitlement, with two optional 10-year extensions attached.
Taken together, that structure could allow the terminal to keep operating for another 40 years, anchoring refined-products handling at Wilmington well into the 2060s if the port and the applicant see the full term through.
Where does the process stand?
The port began the environmental review process in 2023, meaning the draft now out for consultation represents roughly three years of work under the California Environmental Quality Act framework that governs such assessments.
The current stage is the public comment window on the draft report, which runs until 4 January 2027. Stakeholders, including terminal users, tanker operators calling Wilmington and neighbouring harbour interests, have until that date to submit responses to the port.
For tanker owners and charterers trading the US West Coast, the outcome matters in practical terms. A MOTEMS-compliant berthing facility at 150-151 would set the physical parameters, berth geometry and mooring arrangement among them, for vessels calling the Phillips 66 terminal for decades. The continued operation of Berths 148-149 during construction also signals the port intends no gap in tanker handling while the rebuild proceeds.
The port has not indicated a construction start date in the draft; that timeline would follow completion of the environmental review and any subsequent approvals.
via Google News: Ports & Terminals (Source)
More from Sophie Lindqvist
Show full bio
Market editor covering technology and product news in commercial shipping for industry professionals at Vessels.
141 articles
Linked entries
- Port of LA Drafts 40-Year Extension for Phillips 66 Wilmington Oil Terminal
- Phillips 66 Los Angeles berth plan enters draft environmental review
- Port of Blyth unveils 3-hectare plan and 1m channel deepening
- Long Beach clears 937,000 TEUs in October, up 5% on record pace
- Patti Marine puts 800-ton Amanda Joe dock into service