KTU Shipyards starts steel cutting on ATB unit and two crane barges
KTU Shipyards cut steel on a Robert Allan-designed ATB pusher tug and 9,000-dwt chemical barge plus two 65-m crane barges for 2028 delivery, after handing over three tugs and two barges.
Adjustments
- Steel cut in August 2026 on a 27-m pusher tug and 9,000-dwt tank barge forming an ATB unit
- Two 65-m crane barges, KTU-2004 and KTU-2005, started in October for 2028 delivery
- Tank barge complies with the IBC Code for chemicals, palm oil and biofuel, with container/break-bulk deck capability
- KTU delivered three tugboats and two barges between September and early November 2026
- August ceremony handed over four 27-m tugs (Perkasa 14-17) and four barges to one Indonesian industrial group
Indonesian builder KTU Shipyards cut steel on an articulated tug-barge (ATB, a rigidly connected tug-and-barge unit) and two 65-m crane barges between August and October 2026, while delivering five vessels in the past three months.
The newbuilding programme covers a 27-m pusher tug and a 9,000-dwt tank barge for domestic owners, with both steel cuttings performed in August. The two crane barges, designated KTU-2004 and KTU-2005, followed in October, built for an Indonesian owner with delivery scheduled for 2028.
What is behind the ATB design?
Vancouver-based naval architecture firm Robert Allan Ltd supplied its TRAnsfer 2700 design for the pusher tug and the naval architecture for the tank barge. Robert Allan said the ATB pusher tug and barge were "custom designed as an integrated system, greatly improving vessel speed and fuel efficiency when compared to a traditional towed barge."
The designer used computational fluid dynamics (CFD, numerical simulation of water flow around the hull) to optimise the vessel geometry and minimise fuel consumption at cruising speed.
The tank barge complies with the IBC Code (the IMO International Code for the Construction and Equipment of Ships Carrying Dangerous Chemicals in Bulk) for liquid chemical cargoes including palm oil and biofuel, traded across the Indonesian archipelago. To maximise round-trip utilisation, the barge can also carry containers or break-bulk cargo on deck.
How is the pusher tug configured?
The tug uses conventional propulsion: two main diesel engines, engineered to burn biofuels, drive two fixed-pitch propellers through shafts, with two rudders improving the ATB unit's manoeuvrability. The wheelhouse gives the master all-round visibility, including over the pushed barge ahead.
Both the barge and the pusher tug are designed to comply with class rules of Registro Italiano Navale (RINA).
What has KTU delivered recently?
The construction milestones land during a busy delivery period. KTU has handed over three tugboats and two barges in the last three months:
- Early November 2026: tugboat Prima 232 and flat-top barge Maritim 3316
- October: tugboat Portalis 2003 and oil barge Amigo 1
- September: tug Sumber Makmur 18 and oil tank barge SMB 18
All the 27-m tugs follow Robert Allan's TRA 2700 design, with a beam of 8.2 m and a depth of 4 m.
Earlier 2026 deliveries
The Q3 2026 record extends further back. KTU completed barge Blackpink 337, paired it with tugboat Gaskan 01, and delivered the 27-m tugboat Layar Borneo in the same quarter.
In August, KTU held a delivery ceremony for four 27-m tugboats, Perkasa 14 through Perkasa 17, and four barges built for an Indonesian industrial group — a single handover of eight vessels.
The steel cutting on the ATB and crane barges sets KTU's orderbook out to 2028.
via Google News: Shipbuilding (Source)
More from Rebecca Stone
Show full bio
News editor covering people, launches and day-to-day practice in commercial shipping for industry professionals at Vessels.
38 articles
Linked entries
- Cochin Shipyard lays keel for first of two 70T BP tugs for Polestar
- Safe Bulkers takes delivery of first methanol dual-fuel Kamsarmax
- Hanwha Philly Shipyard Cuts Steel on First of Four Jones Act MR Tankers
- Cochin Shipyard lays keel for first of Polestar's two 70-tonne tugs
- Tsuneishi Launches Unnamed Kamsarmax at Fukuyama Yard