Fleet & Shipbuilding

BIMCO shipbuilding emissions proposal reaches ISO ballot

A BIMCO-led ISO proposal would create one method for shipbuilding emissions, from steel and components through sea trials, with a December 27, 2026 ballot and a 2028 target.

BIMCO Proposal Enters ISO Process to Measure Shipbuilding Emissions - News and Statistics - IndexBox
Exhibit · BIMCO Proposal Enters ISO Process to Measure Shipbuilding Emissions - News and Statistics - IndexBox — jannonivergall / pixabay

Adjustments

  1. National standards bodies vote on the proposal through December 27, 2026.
  2. About 20 industry representatives later developed the initial methodology.
  3. Everllence and Danish Standards would lead technical work from January to December 2028 if approved.
  4. BIMCO says the initiative sets no environmental performance thresholds.
  5. Scope runs from raw-material extraction and steel production through component making, shipyard construction and sea trials.

A BIMCO-led shipbuilding emissions proposal has entered the formal International Organization for Standardization (ISO) process, with the national standards ballot due to close on December 27, 2026. Splash 247 reported the process entry on November 26, 2026.

If national standards bodies approve it, Everllence and Danish Standards will lead technical development. BIMCO would support the work. The timetable starts in January and runs to December 2028.

What would the methodology measure?

BIMCO's proposal covers three connected stages:

  • Materials: raw-material extraction and steel production.
  • Shipbuilding: component manufacturing and shipyard construction.
  • Testing: sea trials before delivery.

This scope would capture emissions attached to building a vessel, not only those arising during its operational lifetime. Splash 247 says decarbonisation work has largely favoured vessel-operation emissions, leaving much of construction outside consistent measurement.

BIMCO said: "The initiative is not meant to impose environmental performance thresholds." It instead seeks "a consistent basis for calculating and reporting shipbuilding emissions."

For owners, a common calculation would make the carbon footprint of newbuilding investments more visible. It could support Scope 3 reporting, meaning indirect value-chain emissions. That would give managers a common basis for evaluating newbuilding proposals.

How could owners use it?

The immediate use sits inside capital allocation. Owners could apply one calculation to a newbuilding order. They could use the same method for a major conversion, repair or retrofit. That would put construction emissions on the same footing across capital projects.

For companies reporting Scope 3, the framework could simplify disclosure of emissions tied to vessels built or altered by others under one consistent method across newbuilding and retrofit projects. It would not replace operating-emissions data. Instead, it would fill the construction, conversion, repair and retrofit side of the asset record.

The same framework could sharpen the choice between keeping a vessel and replacing it. Owners could compare a life-extension project with a newbuilding order under one emissions method. The proposal would not prescribe that choice or attach an emissions threshold to it. It supplies a common carbon input for the decision.

The distinction matters because one method would connect newbuilding investment with later conversion, repair and retrofit work. Owners could place those decisions within the same carbon record.

Where did the proposal originate?

The project began at the Tripartite forum. The group brings together shipowners, shipbuilders and classification societies. About 20 industry representatives later developed the initial methodology. National standards bodies now decide whether the draft should proceed.

The ballot is a gate, not the publication of a finished methodology. If national standards bodies approve it, Everllence and Danish Standards will lead technical development, with BIMCO providing support. The planned work starts in January and finishes by December 2028.

That sequence gives the project a two-year drafting window, running from January to December 2028, while producing a specification that could ultimately underpin a full international standard. The output would be a technical specification, a documented calculation and reporting method for shipbuilding emissions.

What happens after the ballot?

Approval would authorize technical work. It would not create a mandatory yard benchmark or vessel carbon limit. The method would measure. It would not dictate how a yard builds or how an owner operates.

The practical payoff for owners would be a consistent carbon figure across newbuildings, conversions, repairs and retrofits, giving investment teams one comparable measure for project appraisal. That figure could inform the decision to extend existing tonnage or order replacements. For companies using Scope 3 reporting, it could make construction emissions easier to include in capital-project disclosures.

The next checkpoint is the ballot close on December 27, 2026. Approval starts a development programme ending in December 2028. Until the technical specification is complete, the proposal will not provide an ISO method for calculating shipbuilding emissions.

via Google News: Shipbuilding (Source)

Share this article:

More from Tom Whitfield

Tom Whitfield

Show full bio

Staff writer covering companies, deals and strategy in commercial shipping for industry professionals at Vessels.

173 articles

Linked entries

  1. ISO Ballot Opens on First Standard for Shipbuilding GHG Emissions
  2. Nine shipping associations seek global GHG framework at IMO’s MEPC85
  3. IMO Net-Zero Framework Faces Dilution Test at October Talks
  4. Nine Shipping Bodies Demand IMO GHG Deal at MEPC 85
  5. IMO Reopens Net-Zero Framework Talks November 30

▲ Previous article