VLCC Deliveries Jump Fivefold as 2026 Orderbook Hits 349 Ships
35 VLCCs delivered in 2026 so far, five times 2025's total, as the orderbook hits 349 ships. Newbuild prices near $145m — close to the 2008 record — yet high returns keep owners ordering.
Adjustments
- 35 VLCCs delivered in 2026 to date versus 7 in all of 2025
- 349 VLCCs on order or launched; 125 due in 2028 and 113 in 2029
- Chinese yards hold 268 orders, about 77% of the global total
- VLCC newbuild price at $144.51m, up 15% y/y, nearing the $154m record of October 2008
- 45.8% of the 932-ship active fleet is 15 years or older; 183 ships are 20-plus
Thirty-five VLCCs (Very Large Crude Carriers) have hit the water in 2026 so far — five times the seven delivered in all of 2025, according to VesselsValue data.
The pace reflects a swollen orderbook. A total of 349 VLCCs are on order or launched worldwide, with delivery peaks of 125 vessels in 2028 and 113 in 2029.
Who is building them?
Chinese yards hold orders for 268 VLCCs, roughly 77% of the global total. South Korean yards hold 59 and Japanese yards 15. Of the 125 ships scheduled for 2028 delivery, 106 will come from Chinese shipyards.
Ordering has accelerated just as fast as deliveries. Owners have contracted 219 VLCCs so far in 2026, against 85 in the whole of 2025.
That demand has pushed newbuild prices up sharply. A VLCC now costs $144.51 million per unit, up 15% year-on-year from $125.6 million — and approaching the all-time high of $154 million set in October 2008.
Why do orders keep coming at near-record prices?
Rebecca Galanopoulos, senior content analyst at VesselsValue, said the surge can no longer be explained by fleet renewal alone: the 349 ships on order or under construction are nearly double the 183 VLCCs aged 20 years or older.
"This surge in VLCC orders can no longer be explained solely by fleet renewal," she said.
She pointed to three drivers working together:
- High profitability. Sanctions and geopolitical factors have kept tanker capacity tight, and disruption to transits through the Strait of Hormuz has pushed VLCC spot rates to previously unseen levels. Returns remain attractive despite high construction costs.
- Tight capacity. The supply shortage supports both freight rates and asset values.
- Energy security. Middle East oil producers, wary of relying on owners unwilling to transit Hormuz, are considering buying or building their own VLCCs to protect crude export capacity. That shifts them from chartering in the open market to directly controlling tonnage — and adds newbuild demand on top of commercial ordering.
Is there a safety valve if the market turns?
The age structure of the fleet suggests yes. There are 932 VLCCs in active service globally. Ships aged 15 years or older account for 45.8% of the fleet, and 183 are 20 or older. If conditions weaken, a large share of older tonnage could head to the scrap beach.
That makes the balance between newbuild deliveries and scrapping volumes the key metric to watch in the tanker market going forward. The fleet is entering a period of expansion rarely seen in recent years, with the delivery peak in 2028-2029 and Chinese yards dominating the cycle.
via Google News: Shipbuilding (Source)
More from Sophie Lindqvist
Show full bio
Market editor covering technology and product news in commercial shipping for industry professionals at Vessels.
102 articles
Linked entries
- VLCC deliveries jump fivefold as 349-ship orderbook builds
- Hanwha Ocean Lands $136m-per-VLCC Order, Highest Price Since 2008
- Advantage Tankers pays $272m for two Hanwha Ocean VLCCs
- COSCO Books 16 VLCCs for $2.01bn as Yards in Three Countries Bag Tanker Orders
- Hanwha Ocean Lands Two-VLCC Order Worth $262 Million