Ports & Terminals

Vigo hands Suardíaz 10,000 m² to park Ford Rangers as Bouzas fills up

Suardíaz takes 10,000 m² at Vigo's PLISAN for Durban-built Ford Rangers as Bouzas Terminal, at capacity, logs 538,050 vehicles through October, while Vigo clears 4.5 million tons.

Suardíaz Stores Ford Ranger at PLISAN in Salvaterra-As Neves - Data Portuaria
Exhibit · Suardíaz Stores Ford Ranger at PLISAN in Salvaterra-As Neves - Data Portuaria — Niklas9416 / pixabay

Adjustments

  1. Suardíaz holds temporary use of 10,000 m² at PLISAN to store Durban-built Ford Rangers through January 23.
  2. Bouzas Terminal handled 538,050 vehicles through October, second in Spain behind Barcelona; 671,665 units in 2025.
  3. Port of Vigo passed 4.5 million tons in the first ten months of 2026; containers rose 5.4% to 272,133 TEUs.
  4. PLISAN's 60,000 m² rail siding esplanade enters service next year, with the ADIF (Guixar) link under construction.
  5. October traffic totalled 498,627 tons; vessel calls up 1% and average gross tonnage up 3%.

Vigo's Port Authority has handed Suardíaz temporary use of 10,000 m² on the PLISAN rail siding esplanade at Salvaterra-As Neves, to store Ford Ranger pickups built in Durban, South Africa. President Carlos Botana reported the authorization to the authority's Board of Directors, saying the operation answers "the high activity of the Bouzas Terminal."

The work began on the morning of the announcement and runs through January 23. The units arrive on ocean-going vessels at Bouzas Terminal, where Suardíaz coordinates operations and the transfer to PLISAN, then feeds them into Iberian distribution. PLISAN debuts here as a logistics support area for vehicle traffic at the Port of Vigo.

Why does Vigo need land outside its own fence?

Because Bouzas Terminal runs at its physical limit. The authority's statistical report, presented at the same board meeting, put vehicle throughput at 538,050 units through October, second in Spain behind Barcelona. Last year the terminal closed on 671,665 units.

  • Bouzas port area: more than 862,000 m², with over 400,000 m² dedicated to ro-ro traffic.
  • Silo: a 60,000 m² multi-story silo already in service; a second, for about 4,000 vehicles, still awaited.
  • Botana's report to the board: the terminal "operates at its capacity limit", so long-stay traffic needs yards such as PLISAN to keep ro-ro lines moving.

What does PLISAN add once the rails connect?

The temporary concession sits on a recently completed rail siding esplanade of 60,000 m², due to enter service next year. Once tracks link with the general railway network, PLISAN should handle flows in both directions: vehicles unloaded at the port for rail distribution across the peninsula and Europe, and automobiles arriving by rail for maritime shipment from Vigo.

The authority has spent months negotiating with operators and specialized companies on a large logistics centre at Salvaterra-As Neves, for vehicle parking and distribution to the peninsular interior and the rest of Europe.

Work is under way to connect the ADIF (Guixar) rail terminal with PLISAN and, afterwards, the plateau, for national and European imports. Value-added work also beckons: final adjustments, touch-ups, and installation of final systems such as sound equipment.

How are Vigo's other cargo lines running?

The port passed 4.5 million tons in the first ten months of 2026, carried by cargo diversification and a container push. Container movement rose 5.4% from January to October to 272,133 TEUs, and containerized general cargo set a record for the period at more than 2.6 million tons, up 1% year on year.

Puertos del Estado figures split that advance into national traffic, up 34.7%, and import and export traffic, up 6.4%. Cars, frozen fish and metals keep the port's industrial lead, with agri-food again a main driver.

  • Fruit: 287,980 tons, a rebound of nearly 35% year on year.
  • Fish: close to 589,000 tons, of which frozen 482,729 t and canned 136,585 t, plus oils, flours and fresh fish from O Berbés, which holds national leadership with over 23,700 tons.
  • Slate +32%, machinery +2.3%, food +1%.

And October on its own?

October traffic at Vigo totalled 498,627 tons, with the month's movers spread across commodities:

  • Fruit +42.36%, raw granite +34%, slate +12.5%
  • Automotive parts +9.7%, food +7.8%, machinery +5%

Vessel calls rose 1% and average gross tonnage grew 3%, which confirms bigger ships on the Vigo quays.

The port's answer to a jammed terminal is more land next door, and the first delivery is sheet metal.

via Google News: Ports & Terminals (Source)

Share this article:

More from Amara Osei

Amara Osei

Show full bio

Senior reporter covering technology and product news in commercial shipping for industry professionals at Vessels.

215 articles

Linked entries

  1. Cádiz links tunnel sections for 1.2 km container access
  2. Manzanillo Moves 2.07 Million TEU, But Off-Dock Yards Won't Fix It Alone
  3. Durban Port Backlog Triggers KZN Freight Enforcement Push
  4. Togo to Upgrade 40 km Lomé Port–Adétikopé Rail Line in 2027
  5. Multilog opens 71,000 sq m bonded terminal in Santos

▲ Previous article▼ Next article