Fleet & Shipbuilding

Toti proposes foreign-invested US frigate yard amid congressional split

William Toti proposed a foreign-invested US frigate yard, while fiscal year 2027 House and Senate drafts set differing limits on overseas construction and auxiliary procurement.

US Navy nominee proposes new shipyard for frigates — Breaking Defense - UA.NEWS
Exhibit · US Navy nominee proposes new shipyard for frigates — Breaking Defense - UA.NEWS — TheoRivierenlaan / pixabay

Adjustments

  1. William Toti proposed one new US shipyard with foreign-company investment for frigates and other surface combatants.
  2. Trump’s August memorandum allows foreign builders, under certain conditions, to construct up to two ships in three Coast Guard Arctic classes before US production.
  3. The administration requested authority for foreign-yard orders covering two surface combatants and two non-combat auxiliary vessels.
  4. The House-approved fiscal year 2027 defense bill prohibits overseas construction of combat ships and combat-logistics vessels.
  5. The Senate committee version permits up to two auxiliary vessels if manufacturers invest in the US maritime industry.

By Rebecca Stone

William Toti’s proposal would put frigates and other surface combatant construction at a new US shipyard with foreign-company investment, with the nominated deputy secretary of the Navy calling it the fastest way to replenish the fleet.

At a hearing of the US Senate Armed Services Committee, Toti said US destroyers were performing missions for which frigates could be used. He argued that a world-class new shipyard focused on frigate construction would provide the quickest route to adding those ships to the Navy.

Where would the ships be built?

Toti supports foreign shipyards building only auxiliary vessels (non-combat support ships). His proposed new domestic yard would take the opposite approach for frigates and other surface combatants: a foreign shipbuilding company would invest, but construction would take place in the United States.

That structure places the foreign participant inside a US industrial base while keeping the shipbuilding work in the United States. Toti said Japanese and South Korean shipyards stand out for their production processes. Bringing their skills and processes to the United States could strengthen the American workforce and industrial capabilities.

He framed the issue around production rather than ship quality.

How does the plan compare with the Finnish model?

Construction of US Navy ships abroad now divides the Trump administration from Congress. Senator Angus King said during the hearing that Toti’s proposal differs from building ships at foreign shipyards, and that discussion would continue. The distinction rests on construction location: Toti described a new US yard receiving foreign investment, not a combatant program shifted overseas.

The administration is separately promoting expansion of the so-called Finnish model. Foreign shipyards build the first vessels in Finland, and subsequent vessels are built in the United States.

In August, President Donald Trump signed a memorandum extending that approach to the Coast Guard’s Arctic ships program. Subject to certain conditions, the memorandum allows foreign shipbuilders to construct up to two ships in three classes at their own shipyards before subsequent production moves to the United States.

The August action sets an overseas production allowance of up to two ships in three Arctic vessel classes. It does not authorize the administration’s wider request covering Navy surface combatants and auxiliaries, which requires a separate congressional decision.

What is Congress being asked to authorize?

The administration asked Congress to permit orders at foreign shipyards for:

  • two surface combatants; and
  • two non-combat auxiliary vessels.

The House-approved version of the fiscal year 2027 defense bill prohibits construction abroad of combat ships and vessels of the combat logistics fleet. That measure blocks the overseas combatant construction sought in the administration’s request and leaves no foreign-built combat ship exception.

The Senate committee version sets a different limit. It restricts construction of combat ships outside the United States but permits procurement of up to two auxiliary vessels, provided their manufacturers invest in the US maritime industry.

For yards and suppliers, the split is now defined by two rules: the House bars overseas combat and combat-logistics construction, while the Senate committee would allow two foreign-built auxiliaries tied to US maritime investment. Toti’s proposal adds a third route: foreign capital supporting a new domestic yard for frigates and other surface combatants.

The immediate commercial question is whether Congress approves any foreign-built combatant work and what investment conditions attach to auxiliary procurement.

Toti’s concept would bring foreign capital into a US yard without shifting the proposed frigate and surface-combatant work abroad.

via Google News: Shipbuilding (Source)

Share this article:

More from Rebecca Stone

Rebecca Stone

Show full bio

News editor covering people, launches and day-to-day practice in commercial shipping for industry professionals at Vessels.

59 articles

Linked entries

  1. Toti proposes foreign-invested US frigate yard amid capacity fight
  2. Navy nominee Cao says allied shipbuilders hold key to US shipbuilding gap
  3. Hanwha Hunts a Third US Shipyard as Navy Order Race Tightens
  4. Hanwha Hunts a Third US Shipyard Beyond Philly and Austal USA
  5. MARAD delegation tours HD Hyundai Heavy's Ulsan yard

▲ Previous article▼ Next article