Ottawa and Ontario Put $250M Into Port of Sault Ste. Marie Build-Out
Ottawa grants $125M and Ontario lends HOPA $125M for a 950-acre Great Lakes port at Sault Ste. Marie, targeting 3.5 million tonnes a year and full buildout by 2031.

Adjustments
- $250M combined funding: $125M federal grant plus $125M Ontario loan to HOPA; city adds up to $15M in-kind
- 3.5 million tonnes of annual cargo projected by 2031, three times current volume
- 950-acre multi-user port on Algoma Steel land, with two seaway-draft berths and a rail transload yard
- 2,150 direct and 2,600 indirect jobs expected, plus roughly $1B annual GDP contribution
- One of the first projects under Canada's $5-billion Trade Diversification Corridors Fund
The Port of Sault Ste. Marie has secured a combined $250 million from the federal and Ontario governments, with construction starting within a year and full buildout targeted for 2031. It's the largest commerce-enabling infrastructure announcement for the city in modern times, and one of the first payouts from Ottawa's $5-billion Trade Diversification Corridors Fund.
Federal Transport Minister Steven MacKinnon and Ontario Transport Minister Prabmeet Sarkaria announced the deal on the city's waterfront on Friday. The fund's other early commitments include an expanded port in Saint John, N.B., and an expanded container shipping terminal in Vancouver.
Under the agreement, Ottawa grants $125 million through the Trade Diversification Corridors Fund. Ontario lends the Hamilton-Oshawa Port Authority (HOPA), the port's future operator, the remaining $125 million. City council has earmarked up to $15 million more for incidental and in-kind contributions — site power, roadwork and other work to keep the project on time and on budget.
What does the money build?
The funding covers the port itself plus:
- Two seaway-draft marine berths (two slips)
- A rail transload yard and upgrades to rail lines connecting the port inland
- Industrial and brownfield land development for port and logistics operations
- Roads, utilities, storage and laydown areas
It all sits on 240 acres of brownfield with long-term growth potential, forming a 950-acre multi-user port on Algoma Steel property. A second phase would activate another 741 acres for business and cargo growth. Initial services could start as early as 2029, with infrastructure, equipment and tenant-ready industrial lands continuing through 2030.
What are the cargo projections?
The business case puts the port at 3.5 million tonnes of cargo annually by 2031 — year five of operations, and three times current volumes. The project is expected to generate more than $900 million in economic benefits, add about $1 billion annually in GDP, create 2,150 direct and 2,600 indirect jobs, and take thousands of trucks off Ontario highways. Ottawa says it will strengthen supply-chain resilience, add routing options for Canadian exporters, improve safety by cutting regional truck traffic, and support an extended shipping season.
Who says what?
"In transportation, every connection matters," MacKinnon said. "Here in the Sault, where Lake Superior meets Lake Huron, there is an incredible opportunity for Northern Ontario businesses to become more connected to the world and get their products to market." He tied the project to Canada's goal of doubling domestic exports outside the United States by 2035.
HOPA President and CEO Ian Hamilton called it "a monumental investment" and one of the few times the province has invested in ports. "We see this as a foundational project to build on marine," he said, citing steel, forestry, agriculture, mining and critical minerals as beneficiary industries.
Sault-Algoma MP Terry Sheehan, who said he put "triple overtime" into the file, called it a game changer for the city and the Algoma District: "Sault Ste. Marie is now the gateway for opportunity for all of Northern Ontario."
Sarkaria stressed that the project can't rely on a single trading partner. "We can't afford to rely on a single trading partner. We need to strengthen our domestic supply chains, open new markets and build a stronger, more self reliant economy," he said.
Why now?
The concept is 70 years old — Skipper Frank Manzutti first proposed it through the Chamber of Commerce in the 1950s, when more than 125 million tonnes of cargo a year moved through the Canadian and American Soo Locks. The most recent iteration modernized and rightsized the 2014 Essar Port plan.
Mayor Matthew Shoemaker credited predecessors Debbie Amaroso and Christian Provenzano for the foundation and said the HOPA partnership supplied the credibility earlier attempts lacked. "Rather than trying to develop it on our own, as was the case with past iterations of this project, we sought out an experienced operator, HOPA Ports," he said, adding the partnership helped establish a credible business case and secure commitments from prospective port users.
HOPA, the largest Canadian port company on the Great Lakes, handles more than $4 billion worth of cargo annually across Hamilton, Oshawa, Port Colborne and Thorold. It will operate the new port, which creates a north-south trade corridor linking Northern and southern Ontario with export destinations beyond — steel, mining, forestry, critical minerals and agriculture sectors first in line.
via Google News: Ports & Terminals (Source)
More from Sophie Lindqvist
Show full bio
Market editor covering technology and product news in commercial shipping for industry professionals at Vessels.
140 articles