Fleet & Shipbuilding

Hanwha Philly Cuts Steel on First of Four Jones Act Tankers

Steel is cut on the first of four 50,000-ton Jones Act tankers for Hanwha Shipping, as the Philadelphia yard targets one delivery every few weeks and a $5 billion facility build-out.

Hanwha Philly Shipyard says it’s ready to build oil tankers and Navy ships at the same time - Inquirer.com
Exhibit · Hanwha Philly Shipyard says it’s ready to build oil tankers and Navy ships at the same time - Inquirer.com — stevepb / pixabay

Adjustments

  1. First of four ~50,000-ton, 600-foot oil and chemical tankers under construction; delivery to Hanwha Shipping in 2029–2030
  2. First U.S.-built tankers of this size in nearly 10 years; yard targets output of one ship every few weeks, up from one every eight months
  3. Hanwha plans a total $5 billion investment and headcount growth from about 2,300 to more than 4,000
  4. Parallel programs: three Matson LNG container ships (first, Makua, delivering next year), up to four Navy LSMs from late 2027, and two MRIV hulls by 2030
  5. U.S.-built ships typically cost more than double comparable Chinese-built tonnage, analysts note

Hanwha Philly Shipyard has started construction on the first of four 600-foot, near-50,000-ton oil and chemical tankers, with deliveries to affiliate Hanwha Shipping scheduled for 2029 and 2030. The steel-cutting ceremony on Tuesday at the South Philadelphia yard also confirmed the company's plan to build the medium-range ships — vessels typically deployed in U.S., East Asian or North Atlantic trades, not long Pacific routes — alongside an expanding U.S. Navy and government orderbook.

The newbuilds are the first tankers of their size built in the United States in nearly 10 years, according to James Sagar, CEO of Hanwha Shipping. The ships "will join the Jones Act fleet to transport the fuels that power American homes, businesses, and communities safely and efficiently," Sagar said in a statement, adding that the vessels will feature "an energy-efficient design" and meet International Maritime Organization standards for the safe carriage of chemicals.

What else is on the yard's orderbook?

The tanker program runs in parallel with several other lines of work:

  • Three LNG-powered container ships for Matson, which operates long-range services between U.S. Pacific ports and China. The first, Makua, was christened last month and is due for delivery next year; the remaining pair is expected by 2028.
  • Up to four Medium Landing Ships (LSMs) for the U.S. Navy, designed to land Marines on Pacific islands, with work on the first starting in late 2027.
  • Two Missile Range Instrumentation Vessel (MRIV) hulls for the U.S. government, planned for completion by 2030 after the yard finishes TS Golden State next year — the last of five U.S. Maritime Administration training and multi-mission ships built since 2020.

The schedule reflects the resolve of newly appointed Hanwha Philly president Hyuk Kim to sustain commercial cargo ship construction while scaling up Navy and government work. The Hanwha group ordered up to 10 tankers for Hanwha Shipping last year as part of a push to raise output at the Philadelphia yard from roughly one ship every eight months to one every few weeks.

How does the yard plan to hit that pace?

Hanwha is adding facilities on 47 recently acquired acres to the 110-acre complex the group purchased in 2024. The company says it has already invested hundreds of millions of dollars and plans a total of $5 billion in cranes, new buildings and piers, dry docks, automatic welding equipment and other infrastructure. The yard employs around 2,300 people today and aims to grow beyond 4,000 welders, pipe fitters, equipment operators, engineers and other workers over the next several years.

Cost remains the open question. Shipping analysts note U.S.-built ships typically cost more than double the price of similar-sized vessels built in China, the world's leading shipbuilding nation, and also exceed prices from Japan and South Korea, where large commercial yards capture mass-production savings. Hanwha says it can bring costs down as production increases.

Why does the Jones Act debate matter here?

The business case rests on the Merchant Marine Act of 1920, the Jones Act, which requires U.S.-built ships and American crews for shipments between U.S. ports. In a statement Wednesday, Hanwha made clear it expects the law to remain in force, despite waivers currently granted to some foreign ships hauling certain cargoes during the Iran war. Since March, when President Donald Trump suspended provisions of the Jones Act, dozens of East Asian-built tankers have carried Texas and Great Plains crude to Philadelphia-area refineries and moved natural gas, butane, fuel and refinery feedstock from Delaware River terminals to plants in New England and Louisiana.

Lobbyists for Hanwha and other shipbuilders, together with organizations representing merchant marine officers and Seafarers union seamen, are pressing for renewed protection of domestic shipping. Refiner interests — including Delta Air Lines' Monroe Energy in Trainer and PBF, which runs refineries in Delaware City and Paulsboro, New Jersey — argue for easing the Jones Act to access cheaper foreign tonnage.

The Philly yard has been the largest builder of Jones Act ships since 2000, when it opened under previous owners at the former Philadelphia Naval Shipyard. With the tanker program, Sagar said, "Hanwha is reaffirming its commitment to the United States, supporting highly skilled American jobs, and helping strengthen the shipbuilding industrial base."

via Google News: Shipbuilding (Source)

Share this article:

More from Rebecca Stone

Rebecca Stone

Show full bio

News editor covering people, launches and day-to-day practice in commercial shipping for industry professionals at Vessels.

59 articles

Linked entries

  1. Hanwha Philly Shipyard Cuts Steel on First of Four Jones Act MR Tankers
  2. Hanwha Philly cuts steel on first of four 49,500-dwt Jones Act tankers
  3. Hanwha Philly Cuts Steel on First of Four Jones Act MR Tankers
  4. Hanwha Cuts First Steel on Four MR Tanker Series at Philly Shipyard
  5. Steel cut for first Jones Act MR tanker at Hanwha Philly

▲ Previous article▼ Next article