Fleet & Shipbuilding

Eastern Shipbuilding wins expanded DDG 139 destroyer-unit award

An Oct. 2 award gives Eastern Shipbuilding the expanded DDG 139 grand-block contract, adding advanced cabling after successful deliveries for DDG 135 and DDG 137.

Eastern Shipbuilding to build more destroyer structural units - WorkBoat
Exhibit · Eastern Shipbuilding to build more destroyer structural units - WorkBoat — wal_172619 / pixabay

By Sophie Lindqvist

Eastern Shipbuilding Group won an expanded destroyer-unit contract from HII’s Ingalls Shipbuilding division for the U.S. Navy’s Flight III Arleigh Burke-class guided missile destroyer Telesforo Trinidad (DDG 139). The award, finalized October 2, adds advanced cabling installation to ESG’s structural-unit work and expands the company’s role in grand-block construction.

The Panama City, Florida, builder described the award as another contract in its collaboration with Ingalls. It follows successful deliveries of units for Thad Cochran (DDG 135) and John F. Lehman (DDG 137). Ingalls remains HII’s shipbuilding division, while ESG performs the unit-integration work under the award.

What will ESG deliver for DDG 139?

ESG will integrate the destroyer’s major production elements into a fully assembled grand block, the combined unit formed under the contract. Its integration scope covers:

  • structure;
  • HVAC (heating, ventilation and air conditioning);
  • piping;
  • electrical systems; and
  • outfitting.

Outfitted structural work goes beyond supplying bare structure. Under DDG 139, ESG must bring the listed disciplines into the same integrated assembly, with advanced cabling added at the unit level.

The expanded package keeps structure and the principal installed systems under one grand-block contract, rather than limiting ESG’s role to individual production elements. Cabling joins that scope before the unit is presented as a fully assembled grand block.

What changed with the October 2 award?

The Oct. 2 decision follows ESG’s successful delivery of units for DDG 135 and DDG 137. ESG now adds DDG 139 to that delivery history, with the same broad integration work and one additional named package: advanced cabling installation.

The references to DDG 135 and DDG 137 describe earlier completed deliveries; the announcement identifies only DDG 139 as the recipient of the expanded October 2 scope. Officials said the company has leveraged the established expertise and manufacturing efficiencies developed through previous Arleigh Burke-class (DDG 51) unit deliveries.

The completed DDG 135 and DDG 137 deliveries give the new award direct performance context within the same destroyer class. ESG has already performed unit work for two named Arleigh Burke-class destroyers, while DDG 139 expands the package through advanced cabling.

Joey D’Isernia, CEO of Eastern Shipbuilding Group, said: “We are proud to continue our vital collaboration with HII to support the production of the U.S. Navy’s surface combatant fleet. Our company has worked diligently to become a trusted distributed shipbuilding partner to HII.”

Why does the cabling scope matter?

“The addition of the new cabling scope to our Grand Block construction is proof positive that we are not only a trusted partner, but also a true force multiplier in the effort to increase the production rate of the destroyer fleet,” D’Isernia said.

D’Isernia tied the broader package to HII’s effort to raise destroyer output. For DDG 139, that means ESG combines structure, HVAC, piping, electrical systems and outfitting with advanced cabling inside the grand-block scope.

The Oct. 2 award therefore extends an established relationship: ESG has already delivered DDG 135 and DDG 137 units, and now carries broader unit-level integration and cabling responsibility on DDG 139. The work supports the Navy’s surface combatant fleet, with HII seeking a higher production rate for the destroyer fleet.

via Google News: Shipbuilding (Source)

Share this article:

More from Sophie Lindqvist

Sophie Lindqvist

Show full bio

Market editor covering technology and product news in commercial shipping for industry professionals at Vessels.

31 articles

Linked entries

  1. Eastern Shipbuilding wins USS Telesforo Trinidad grand block work
  2. GTT wins five-vessel MISC LNG tank order at Hudong-Zhonghua
  3. Jiangnan begins 175,000 m³ LNG carrier series for Shell
  4. COSL orders 59 offshore support vessels in $1.64bn deal
  5. DEME orders two uncrewed offshore survey vessels for 2027

▲ Previous article▼ Next article