DP World raises Maputo investment to $200m, targets 650,000 TEU
DP World has raised its planned Maputo investment to $200 million and targets 650,000 TEU annually by Q2 2027, alongside a weekly China Africa Link due later this month.

Adjustments
- DP World raised planned Maputo investment from $165 million to $200 million.
- Maputo container terminal targets 650,000 TEU annually by Q2 2027, versus 225,000 TEU now and 530,000 TEU previously.
- The weekly China Africa Link is scheduled to begin later this month.
- The service’s seven-port rotation covers Shanghai, Ningbo, Nansha, Port Klang, Dar es Salaam, Maputo and Singapore.
- Maputo port handled 32 million tonnes of cargo in 2025, up 3.4% from 2024.
By Amara Osei
DP World has raised its planned investment in Mozambique’s Maputo container terminal from $165 million to $200 million. The company now targets 650,000 TEU of annual capacity by Q2 2027, against 225,000 TEU today and its previous target of 530,000 TEU.
What does the expanded terminal change?
The increase was announced after a meeting between DP World Group Executive Chairman Essa Kazim and Mozambique President Daniel Chapo. DP World said: “The extra capacity would allow larger vessels to call at the terminal and improve operations.” The statement puts vessel size and operating performance at the centre of the project.
The terminal forms part of a wider port and transport network. DP World operates the container terminal and holds a share in the Maputo Port Development Company, whose concession runs until 2058. The terminal therefore sits inside a long-term port framework rather than a stand-alone project.
When does the service sail, and where does it call?
The weekly China Africa Link is scheduled to begin later this month. Its scheduled port rotation is:
- Shanghai
- Ningbo
- Nansha
- Port Klang
- Dar es Salaam
- Maputo
- Singapore
Maputo is one call in a scheduled multi-port service, not a direct China-to-Maputo route. For cargo planners, that distinction is not cosmetic: the service links Maputo into a wider network rather than running a point-to-point string. The weekly frequency provides a regular service option, but vessel schedules will still determine how the call fits into wider cargo movements.
How large is Maputo’s cargo flow?
Maputo port handled a record 32 million tonnes of cargo in 2025, up 3.4% from 2024, according to the Maputo Port Development Company. That figure covers the entire port, including bulk goods. It is not the container terminal’s annual capacity, which is measured in TEU.
The two headline numbers do different jobs. TEU measures container-handling capacity; tonnes measure cargo weight across the wider port. Adding them together would produce a large number and no useful operational metric. Maputo’s 2025 cargo record is therefore encouraging, but it does not mean the terminal already has room for 650,000 TEU.
The Maputo Corridor links the port with South Africa’s inland provinces of Gauteng, Mpumalanga and Limpopo. Together, the expanded terminal and the weekly China Africa Link could give importers and exporters another route between Asia and Southern Africa. The corridor’s reach extends well beyond Maputo, which is precisely why its inland connections matter to the business case.
Does 650,000 TEU mean faster or cheaper freight?
No. Expanded capacity does not guarantee either result. The outcome will also depend on vessel schedules, port efficiency, and the road, rail and border connections serving the corridor.
The terminal can handle more containers; that does not decide how quickly a box crosses Southern Africa or what an importer pays. The corridor must work as a chain, not just as a berth. Any promise of quicker transit or lower rates has to survive all three links: maritime calls, port execution and inland transport.
DP World’s $200 million plan raises the capacity target to 650,000 TEU by Q2 2027, while the China Africa Link is due later this month. Operators gain more room for larger vessels; importers and exporters gain a potential additional Asia–Southern Africa route.
Capacity is the headline. The corridor still has to deliver.
via Google News: Ports & Terminals (Source)
More from Amara Osei
Show full bio
Senior reporter covering technology and product news in commercial shipping for industry professionals at Vessels.
125 articles
Linked entries
- DP World lifts Maputo terminal commitment to $200 million
- Posorja terminal expands to 800m berth and 1.4m TEU capacity
- Conakry Hits 11.5 Days Waiting as Global Port Congestion Deepens
- Japan's MLIT plots five-year port tech plan built on AI and remote cranes
- Togo to Upgrade 40 km Lomé Port–Adétikopé Rail Line in 2027