Cracked Laker Michipicoten Departs Fraser Shipyards for Scrap
The Michipicoten left Fraser Shipyards in Superior on Friday after two years, headed for scrap. Hull cracked near Isle Royale in 2024; crew evacuated, Coast Guard towed the ship.

Adjustments
- Michipicoten departed Fraser Shipyards in Superior on Friday at about 9 a.m., after two years at the yard.
- Hull cracked near Isle Royale in Lake Superior in 2024; vessel took on water and the crew was evacuated.
- The Coast Guard hauled the ship to a shipyard following the 2024 incident.
- Conversion into a barge was considered but rejected because the damage was too extensive.
- The freighter is expected to be scrapped for its steel.
The freighter Michipicoten left Fraser Shipyards in Superior, Wisconsin, on Friday morning, ending a two-year stay at the yard. It is expected to be scrapped for its steel.
The departure came a little after 9 a.m. Dozens of people gathered to watch the ship go. They got a bonus day of waiting. The vessel had been scheduled to leave at about 8 a.m. Thursday, but the departure was delayed.
How did the ship end up here?
The answer sits 200-odd miles up the lake. The Michipicoten took on water in Lake Superior near Isle Royale in 2024 after its hull cracked. The crew was evacuated. The Coast Guard hauled the ship to a shipyard, and that tow effectively wrote the vessel's ending.
A hull crack on a working freighter is not a repair job with a fixed price and a fixed schedule. It is a verdict. Once the plates opened and the hull shipped water in a big cold lake, the accountants were always going to get the last word.
For the record, the timeline now runs like this:
- 2024: Hull cracks near Isle Royale; vessel takes on water.
- 2024: Crew evacuated; Coast Guard tows the ship to the yard.
- 2024–2026: Michipicoten lies up at Fraser Shipyards in Superior.
- Friday: Departure a little after 9 a.m., roughly 25 hours behind the Thursday schedule.
What was the alternative to scrapping?
The Michipicoten was considered for conversion into a barge. That option is the classic end-of-life reprieve for an aging laker — cut down the hull, strip the machinery, and tow the remains as a dead ship. It buys years of service at a fraction of the cost of new tonnage.
But the damage was too extensive. The conversion route closed, and scrapping became the destination. Steel recovery is the only value left in the hull.
Why does a departure draw a crowd?
Dozens of people watched the Michipicoten leave. On the Great Lakes, that is not unusual. These ships work the same ports for decades, and their names become local furniture. A freighter that has been tied up at the yard for two years, and is now leaving for the last time, marks the moment a familiar silhouette leaves the lakes for good.
The scrapping itself closes a chapter that opened with a crack. The sequence — hull failure, evacuation, Coast Guard tow, two years alongside, barge study rejected, final departure — compresses an entire lifecycle decision into about two years.
The last line of the story is short and final: the steel goes to the furnace. The Michipicoten is expected to be scrapped.
via Google News: Shipbuilding (Source)
More from Tom Whitfield
Show full bio
Staff writer covering companies, deals and strategy in commercial shipping for industry professionals at Vessels.
193 articles
Linked entries
- Three crew dead as longliner Jökull sinks off eastern Iceland
- Patti Marine puts 800-ton Amanda Joe dock into service
- One dead, three missing as 1997-built boxship Halima sinks off Cuba
- French Navy Helicopter Airlifts 19 Crew from Bulker Miro G Aground off Landes
- Allseas Launches 100 m Construction Vessel Echo at Wuchang